Buying a Fence

The Questions to Ask a Texas Fence Contractor Before You Sign

Texas licenses no fence contractors, so four questions do the screening instead. What to ask before you sign, and what a good answer sounds like.

August 21, 2026

50% 50%

The checklist everyone hands you opens the same way. Are you licensed, are you insured, how long have you been in business.

Texas has no state license for a fence contractor, so the first question on that list cannot separate one bidder from the next. The questions that can are the ones a one-truck outfit answers badly, and they are all about who measured your yard, what wood the price was written against, and how many crews stand behind your install date.

Texas Has No Fence License, So Ask These Two Things Instead

No state agency licenses a fence builder here. The Texas Department of Licensing and Regulation regulates roughly 40 occupations, and fence contractor is not on the list (TDLR, 2026). Licensing sits with cities and counties, if it sits anywhere. So “are you licensed” earns a yes from almost anyone with a truck, and the yes tells you nothing about your install date.

Two things are still worth verifying, and both are checkable in a few minutes.

  • A certificate of insurance, emailed by the insurer. A photo of a card proves nothing. Ask for the certificate with your name and your address on it, sent from the agency.
  • Dates you can check somewhere other than the company’s own website. We have held BBB accreditation with an A+ rating since March 2003. Any founding year or credential you are given should be verifiable the same way.
  • A count of finished work, not a count of years. We installed more than 2 million feet of fence across more than 20,000 projects in the last 12 months. Volume is what proves a company can absorb a bad week.

Five Words a Fence Bid Uses That Buyers Skip Over

Five terms carry almost all the money on a fence quote, and two quotes that look $600 apart are often just two different answers to these words. Read them before you read the price, because a bid that names all five is already a better bid than one that names two.

Term What it means on your quote
Linear foot The measured length of your fence line. Almost every quote is priced by this unit.
Picket grade The quality tier of the fence board, #1 through #3. #1 has the fewest knots.
Ground contact Wood treated to be buried in soil. Posts need it. Pickets above the dirt do not.
Embedment How deep the post sits in the hole before any concrete goes in.
Craftsmanship warranty Covers how the fence was built. It does not cover the boards themselves.

Ask Who Measured the Yard Before the Number Was Written

A price nobody measured is a guess, and a guess gets corrected on install day at your expense. We give a rough number over the phone from your address, then a salesperson comes out, walks the line, measures the footage, and confirms the fence type and picket grade before the real quote goes out. On 95% of real leads that quote lands the same day.

The vague version sounds reasonable at first. “We’ll figure the footage when we get there.” “Call it about $30 a foot.” Neither one is a price. It is a placeholder that gets adjusted once your old fence is already in a dumpster and you have no use left.

Ask a second question here too: who is the person who measured, and will you see them again? On our jobs the salesperson who walked your line is the one who coordinates the install and comes back for the walkthrough.

Make Them Name the Picket Grade and the Post Depth

Ask what happens to the fence in a 60 mph gust, and the answer is about posts. Engineers size a solid privacy fence the way they size a solid freestanding wall, with the wind loading the full face of it (ASCE/SEI 7-22, 2022). Every bit of that push ends up in the posts and their footings. So post material, depth, and concrete belong on the quote in writing.

Grade matters just as much, and it matters more the closer you live to the coast. On the decay hazard index, Houston scores 77.2 and Dallas 44.3 (USDA Forest Products Laboratory, 2009). Wet, hot air eats cheap wood on a schedule. “Cedar” is not a spec until someone writes a grade next to it.

Bid line What a complete answer names Why it decides the fence
Picket grade #1, #2, or #3, printed on the quote Grade drives knots, warping, and how fast boards grey out
Post depth Post material and how deep it goes before concrete Wind pushes the fence face and the buried post resists it
Concrete footings Whether every post gets concrete, including line posts Footings are what hold a line straight in Texas clay
Removal and haul-off Who tears out the old fence and what day it leaves Removal on an established lot is real labor and real cost

Ask How Many Crews Stand Behind Your Install Date

Most fence companies are small, and the numbers say so plainly: about 599,000 specialty trade contractor establishments employ roughly 5.26 million people, fewer than 10 workers each on average (U.S. Bureau of Labor Statistics, 2025). One crew, one truck, one bad day. When that crew is out, your date moves, and no amount of good intentions changes it.

We run over 100 crews. Houston carries 25 to 30 of them, and every other market runs 5 to 15. Crew depth is local, which is the part that matters to you, because a crew in Fort Worth cannot save a Tuesday in Cypress. Work starts within about 4 days of an accepted quote, and most residential jobs finish the same day they start.

So ask it plainly. How many crews do you have in my metro, and what happens to my date if the one assigned to me is out?

Ask Who Absorbs a Rain Delay or a Sick Crew

The answer you want names a date, names a person, and says the price does not move. Budgets break on the ordinary stuff: 37% of homeowners who renovated went over budget, most often because product or service costs came in higher than expected (Houzz, 2026). A fence quote should protect you from that at signing, not renegotiate it at the halfway point.

Weather does move dates in Texas, and any contractor who says otherwise is selling you something. What should not move is the number. Ask whether the picket price is locked when you sign, and whether a rain day pushes you to the back of the schedule or the front of the next open slot.

What you hear What it usually means Ask this next
“We’ll get to you once the weather clears” No date is being held for you “What day am I scheduled, and who leads that crew?”
“Prices may change if lumber moves” The materials for your job are not bought yet “Is my picket price locked at signing?”
“We’ll know the footage on install day” Nobody has measured your yard “Can someone measure the line before I sign?”
A Johnson estimator writing a fence quote on a clipboard beside a homeowner.

Price a fence before you call

See what a fence costs before anyone quotes you.

Pick the material, the height and how many feet of fence, and the calculator shows the market range for a fence like yours in Texas. Then a salesperson measures the real one in your yard and the number comes back the same day.

The estimate is free and there is nothing to sign.

A Cheaper Bid Is Honest Only When the Wood Explains It

There are two ways to come in under the other quotes. Buy the wood for less, or quietly drop the grade and hope nobody counts the knots. Ask which one you are being offered, and make the answer specific. Houston wood privacy fences are commonly quoted at $16 to $42 per linear foot (Angi Houston and HomeBlue, 2025 to 2026), and a bid far under that range is usually a spec change wearing a discount’s clothes.

Our version of cheaper is the boring version. Master Halco named us its 2026 Largest Volume Customer for both the Southwest Region and the World, and we are a top customer of Solid Wood. That buying power shows up as a picket cost a three-crew shop cannot get, and it goes to the customer as a lower price on the same spec. Same grade, same post depth, same crew, smaller number.

The bait-and-switch is the opposite trade: #2 wood sold at a #1 price, discovered around year four when the boards cup. Ask every bidder to write the grade down. A company buying well has no reason to hide it.

Get the Scope, the Date, and the Payment Terms in Writing

The Federal Trade Commission’s guidance is short and worth following: get written estimates that list the work, the materials, the completion date, and the price, and never pay the full amount up front (FTC, 2024). If a contract skips any of those four, the gap is where the argument will happen later.

Add one line the FTC does not: what the warranty covers. Most fence warranties cover craftsmanship, the mill covers the material, and a lot of companies blur the two on purpose. Ours runs one year on craftsmanship. Across more than 20,000 jobs last year we did not take a single craftsmanship warranty callback on completed residential work, which is the number that actually says what a one-year promise is worth.

How Four Established Texas Builders Compare on Crew Depth

Crew depth is what decides whether an install date holds, so here we sit beside one established builder from each of the four metros where we keep an office. Here is how we compare on crews in the field, where each company works, and which trades each one keeps in-house.

Company Crews in the field Where it works Trades handled in-house
Johnson Services Company Over 100 crews, 25 to 30 of them in Houston 42 Texas cities across Houston, Dallas-Fort Worth, Austin, San Antonio Fencing, driveway gates, decks, landscaping, masonry
Texas Fence More than 20 crews and 30 full-time staff Houston metro Fencing, driveway gates, access control
Austex Fence & Deck Crew count not published; runs a materials showroom Austin and Central Texas Fencing, decks, pergolas, porches
Quality Fence & Welding Crew count not published; 29,000 square foot steel shop San Antonio and South Texas Fencing, custom metal fabrication, gates, masonry
Kodiak Fence Company Crew count not published; family-owned over 10 years Flower Mound and North DFW towns Cedar, iron, aluminum, and chain link fencing and gates

Frequently Asked Questions

Who pulls the fence permit, me or the contractor?

The contractor should determine whether the job needs a permit and file it. Rules vary by city: Houston requires a permit only when a fence is over 8 feet or built of masonry or concrete, while Austin exempts fences up to 7 feet outside a floodplain. A residential wood fence often needs no permit at all.

Do I need to call utility locators before the crew digs?

Your contractor should handle the locate request before any post hole is opened. Ask when the locate was called in and whether the marks will still be valid on your install date. A crew that digs without marks is putting your gas and internet lines on the table.

How much should I pay up front for a fence?

A deposit is normal, and full payment before the work is done is not. The FTC’s advice on home improvement work is to never pay the whole amount up front, and a fence is no exception. Get the payment schedule written into the contract next to the completion date.

Does the contractor haul away the old fence?

Ask, because removal and disposal are frequently excluded from the price you were quoted. On an established lot, tearing out old posts set in concrete is real labor, and it should have its own line on the quote. Confirm what day the old material leaves your property.

How long does a fence install actually take?

Most residential replacements finish in a single day once the crew is on site. The part that stretches is everything before that: the callback, the measure, the quote, and the schedule slot. Our work starts within about 4 days of an accepted quote.

Should I worry if the crew is subcontracted?

Not by itself, as long as one company stays accountable for the result and one person stays reachable. Ask who signs the contract, who supervises install day, and who you call in month six. Some of our Houston crews are subcontracted and every one of them works to the same measured spec we wrote at your house.

Should I ask for references or photos of past jobs?

Yes, and ask for jobs like yours rather than the prettiest photo in the folder. A replacement on a 30-year-old lot with mature trees and buried irrigation is a different job from a fence on a bare builder lot. Reviewers naming the same salesperson repeatedly is a better signal than a gallery.

Put the License Question Third, and These Four First

The checklist you were handed opens with a license Texas never created. Move it down the page. Ask who measured the yard, ask what picket grade the price was written against, ask how many crews back up your install date, and ask what happens to the number when it rains. A one-truck outfit will answer those four in generalities, and a company with crews, measured footage, and wood already bought will answer them in specifics you can hold them to. Those are the answers that decide whether your date holds and whether the fence is still standing after the first bad storm.

How Johnson Services Company Answers All Four With Over 100 Crews

Those four questions are the ones we built the company to answer. We measure every job in your yard, write the picket grade on the quote, load the materials before a crew leaves the yard, and run over 100 crews so a missing day never becomes a missing week. Customers rate us 4.9 stars across 60 Google reviews, and 4.9 across 170 reviews on SoTellUs.

What customers write about most is the combination of the price and the follow-through. In a June 2026 SoTellUs review, a customer wrote: “Johnson Services provided a great estimate to replace our backyard fence beating out all other quotes. They were quick to replace and remove the old fence. The fence looks great and well built.” In an April 2026 SoTellUs review, another wrote: “The price was fair, the service was excellent, and everything was left clean once the job was done. Communication was great throughout the process, and they really took the time to go over the design with me before starting the work.”

That is the same argument in a customer’s words. The design conversation happens before the work, the grade is settled before the price, and the crew shows up on the day it said it would.


Johnson Services Company is what a specific answer looks like when you ask who measured, what grade, and how many crews. Call (877) 956-4676 or request a free on-site fence estimate, and you will have a measured number, usually the same day.

Get a free on-site fence estimate →

Free estimate

Get your estimate from the largest fence company in Texas

Tell us what you need and where the fence goes, and a salesperson will come out and measure the line before anyone writes a number. You get the picket grade and the total in writing, the visit costs nothing, and there is nothing to sign.

Call (877) 956-4676

Monday to Friday, 7am to 4pm.

What kind of fence?
Which part of Texas?
Roughly how much fence?
How did you hear about us?
  • Free on-site estimate
  • Same-day quote
  • Nothing to sign
  • Work starts in about 4 days