Masonry fences in Texas need a continuous reinforced concrete footing, and brick columns need their own footing.

A pair of limestone columns with cast stone caps at a driveway, with iron panels leaving the outer column

A masonry fence in Texas needs a continuous reinforced concrete footing, usually a grade beam or strip footing, and a brick column needs its own reinforced concrete footing or pier below grade. No single size applies statewide: height, soil, wind and any gate load set it, and cities such as Frisco, Midlothian and Liberty Hill require an engineered design.

Most homeowners meet this the hard way. A quote arrives with a price per foot and no word about what goes under the brick, or a thin pad goes in and the wall pays for it later. Get the footing named before you sign anything.

A Texas masonry fence footing is steel-reinforced, not a concrete curb

The footing under a masonry fence is structural concrete with longitudinal reinforcing steel and vertical dowels that tie the masonry’s reinforcement into the foundation. It is not an unreinforced landscape curb. The Concrete Masonry & Hardscapes Association publishes engineering guidance on that reinforcement and on footing sizing for masonry fences.

For a typical freestanding masonry fence, the foundation is a continuous reinforced concrete grade beam or strip footing. Continuous means it lies under the whole length of the wall, so the load spreads along the wall instead of landing on a few points.

A landscape curb can look like a footing from the street. Only one of them has steel inside it and dowels reaching up into the brick. When a quote says “concrete footing” and says nothing about steel, ask what kind.

How is a brick column footing different from a fence footing?

A standalone brick column sits on its own isolated reinforced concrete footing or a reinforced pier extending below grade, not on a continuous strip. That footing is sized for the column’s total weight, height and width, wind overturning and the soil’s bearing capacity. A column that carries a driveway gate needs substantially more consideration than a decorative one, because the gate’s load is added.

A fence footing spreads along the wall. A column footing sits under one narrow stack of brick, which is why it gets its own design. Width has to be enough to resist overturning and to spread the load into the ground.

The same column can need a very different footing in two yards. The correct footing depends on the height of the fence, whether it is solid brick or stone, soil conditions, wind exposure, and whether the columns support gates or other loads. Two gate columns that look identical from the driveway can sit on different footings if one swings a heavy gate and the other holds a lamp.

How do Texas soil and wind change what the footing has to do?

Texas gives a footing two jobs at once: stay put in soil that moves, and hold a wall upright in strong wind. The national design-load standard maps the Houston metropolitan area at basic design wind speeds of 130 to 140 mph for ordinary structures in open terrain, rising toward 150 mph at the immediate Gulf shoreline (ASCE/SEI 7-22, 2022).

A solid masonry wall catches that wind like a sail, and the footing is what keeps it from tipping. That is why width matters: the footing has to be wide enough to resist overturning and to spread the wall’s load.

The ground moves too. Houston Black, the official Texas State Soil, covers 1.5 million acres of Blackland Prairie from Dallas south to San Antonio. The USDA Natural Resources Conservation Service classifies it as a smectite-clay Vertisol, about 60 to 80% clay, with very high shrink-swell potential, a recognized limitation for building-site development (USDA NRCS, 2023).

Clay that swells when wet and shrinks when dry pushes and pulls on whatever sits in it. Depth has to account for soil conditions, erosion and lateral stability. A footing sized for firm ground in one town will not be the footing for clay in the next.

Which Texas cities require an engineer on a masonry fence footing?

Midlothian requires masonry walls and foundations to be engineered and sealed by a Texas professional engineer. Frisco requires masonry fences to have an engineered design approved by Building Inspections, and Liberty Hill requires engineered construction details and wind-load calculations. Local codes and engineering requirements differ by city and county, so the city where the fence stands sets the footing.

The big metros have their own triggers. Houston has no zoning, and the City of Houston requires a building permit for a residential fence built wholly or partly of masonry or concrete at any height (City of Houston, 2026). An ordinary wood or metal fence 8 feet or under is exempt, so a brick fence of any height is treated differently from a wood one.

Dallas sets its permit line by height. A fence permit is required above 4 feet in a front yard or 6 feet in all other locations, and a fence over 9 feet needs Board of Adjustment approval, a building permit and plans sealed by a licensed professional engineer, according to the Dallas Planning & Development Department.

Austin Development Services requires a permit for a fence in a floodplain regardless of height, and that applies to any material, wood, metal or stone. A brick fence near a creek in Austin is a permit job before anyone mixes concrete.

How is a masonry fence footing built, step by step?

A masonry fence footing is built with longitudinal reinforcing steel, and vertical dowels connect the masonry’s reinforcement to the foundation. Those dowels are what turn the footing and the wall into one structure, so they go in with the footing, before the first course of brick.

The steel and dowels are the parts you can ask about. A footing poured without dowels leaves nothing to tie the wall to the ground, and the brick above it rests on its own weight alone.

Where your city requires an engineered design, the steel, the dowel layout and the footing size come from that design. Ask to see it before the pour.

A Johnson estimator writing a fence quote on a clipboard beside a homeowner.

Price a fence before you call

See what a fence costs before anyone quotes you.

Pick the material, the height and how many feet of fence, and the calculator shows the market range for a fence like yours in Texas. Then a salesperson measures the real one in your yard and the number comes back the same day.

The estimate is free and there is nothing to sign.

What should a brick fence quote say about the footing in Texas?

Footing figures are preliminary until local code and a structural engineer confirm them, so a quote that gives a number before the site is measured is guessing.

A quote that names none of the height, soil, wind exposure or gate load has not looked at your yard.

Look for four things in writing: what is being built, the height and the column width, the city where the fence stands, and whether any column carries a gate. Add the soil and the engineering requirement, and you can compare one quote against another on the same footing.

Who can build and pour the footing for your brick fence or columns?

Four Texas fence companies work the metros where homeowners price this job, and each publishes its own markets and crew count. Match the market column to your city, then read the build column for what each company says it does.

Company Texas markets served Crews in the field Published build or warranty detail
Texas Fence Houston metro and surrounding areas over 20 crews In business since 2003; more than 30,000 fences built; 30 full-time staff
Quality Fence & Welding San Antonio metro; South Texas Crew count not published In business since 1980; 5-acre facility; 29,000 square foot steel fabrication shop
Austex Fence & Deck Austin metro; Central Texas Crew count not published 30+ years serving Central Texas; claims 200,000-plus projects; full materials showroom
Kodiak Fence Company Lewisville, Argyle, Trophy Club, Denton, Carrollton, Coppell; Flower Mound and North DFW Crew count not published Family-owned 10-plus years in Flower Mound; workmanship warranty

Each row reflects what that company says about itself: where it works, how many crews it fields and what it has built.

Why have Johnson Fence build your masonry fence and brick columns?

We lead with price. Johnson was Master Halco’s 2026 Largest Volume Customer for the World, and we are a top customer of Solid Wood. That buying power gives us a real price advantage on wood pickets, and we pass it through to you.

Every project is priced by custom quote once we have done a free on-site estimate. There is no fixed published price list, because cost depends on fence type, materials, length, gates and site conditions, and we publish no per-foot price. A footing is the same: no number is worth trusting until someone has measured your site.

What set us apart was measuring every job in advance, standing behind everything we built, and running multiple crews for reliability. We run over 100 crews. That matters because the backyard fence is the last trade on site before a home can close. Our quote names the picket grade, #1 to #3, by name, and our craftsmanship warranty is one year from the foreman walk-through. It is a craftsmanship warranty only.

Where your project needs a permit, we determine it and file it. In an August 2025 Google review, Chuck S. wrote: “Worked with me to design my project, made changes w/o hassle, showed up on time, techs did their work efficiently and in a day.”

FAQ

Is a shallow concrete pad enough under a brick column?

No. In Texas, a masonry fence or brick column generally needs a reinforced concrete footing, not simply a shallow concrete pad or a few inches of concrete below grade. The size depends on height, soil, wind and any gate load.

Why does a masonry fence need weep holes and drainage?

A masonry fence needs weep holes and drainage provisions where the design calls for them. Drainage sits in the same design as the steel and the structural concrete, so ask where it is shown.

What do you need to know before a masonry footing can be sized?

Start with what you are building: a solid brick privacy fence, brick columns with iron fencing between them, standalone decorative columns, gate columns or a stone wall. Then know where in Texas it stands, because the city sets the engineering requirement.

What does the International Residential Code say about a footing?

The International Residential Code requires exterior foundations to transfer structural loads safely into suitable soil. A footing is the part of a fence that does that job. For a masonry fence, it carries the weight of the brick into ground that can hold it.

How do you find your city’s rule for a masonry fence footing?

Local building codes and engineering requirements can differ by city and county. Start with the city where the fence stands, which is often not the city on your mail, and ask its building office what it requires for a masonry fence and for columns.


Johnson Fence gives you a free on-site estimate where the footage is measured in your yard, so the number on paper starts from your site and not from a guess.

Request a free estimate for your fence and columns →

Free estimate

Get your estimate from the largest fence company in Texas

Tell us what you need and where the fence goes, and a salesperson will come out and measure the line before anyone writes a number. You get the picket grade and the total in writing, the visit costs nothing, and there is nothing to sign.

Call (877) 956-4676

Estimate requests get a reply 24 hours a day, 7 days a week.

What kind of fence?
Which part of Texas?
Roughly how much fence?
How did you hear about us?
  • Free on-site estimate
  • Same-day quote
  • Nothing to sign
  • Work starts in about 4 days