Choose the Leander fence company that measures your yard on site and writes the picket grade, post depth and warranty on the quote. Johnson Fence does all three, with over 100 crews behind the start date.
Most homeowners reading this have already met the other kind of company: the fence that failed too soon, the quote that left out the grade, the crew that never came back. Each of those starts the same way, with a number nobody measured and a promise nobody wrote down.
Pick the Leander fence company that measures your yard first
A company that has not walked your fence line cannot price it. Our salesperson meets you on site, measures the linear footage and confirms the fence type and picket grade, so the number on the quote comes from your yard and nothing else.
Judge every company on the same six things: recent reviews, years in business, license and insurance, warranty, quote quality and the materials it sells. Put them side by side before you let anyone start. A company that skips the measuring leaves you the gaps. A one-star Google review of Fence Pros of Texas, posted March 27, 2026, reads: “No showing an initial evaluation and quote with no notifications”
Start with the measuring, then weigh the other five against the quote you hold.
What fence rules apply in Leander before you hire anyone?
Leander caps a fence along a shared property line at 8 feet, and a fence in the front yard of a single-family home at 3 feet (Leander Code of Ordinances, 2026). Near a street corner the rule tightens: within 25 feet of the intersection of rights-of-way, nothing more than 20% solid or more than 3 feet high may stand.
Other districts get a harder line. The code allows no fencing in the front or side street setback of any district that is not single-family or two-family. A company that quotes you a tall front-yard fence has skipped the ordinance.
The city also charges for the paperwork. Leander lists a $40.00 permit fee, a $50.00 application fee and a $20.00 plan review fee for a fence permit (Leander Code of Ordinances, 2026). When a job needs a permit, we file it. Ask every company you call who files it and who pays the fees.
What does a fence cost per foot in Texas before you collect quotes?
An installed six-foot cedar privacy fence runs $35 to $55 per linear foot in the Dallas-Fort Worth area (EcoFlow Landscaping, 2026). Ornamental steel runs higher in Austin.
In Houston, Detail Construction’s 2026 guide lists $38 to $55 per linear foot installed for six-foot cedar fencing with steel posts. For steel, Freedom Fence & Gates puts ornamental steel in Austin at $40 to $80 per linear foot installed (2026). Around Houston, Affordable Texas Steel puts a welded ornamental steel fence at roughly $25 to $55 per linear foot installed, depending on height, style and who is building it (2026).
Those are market ranges from other publishers, and they tell you where to start. They cannot tell you what your fence costs. Our pricing is per linear foot, set by the footage we measure on site and the picket grade you choose, from #1 through #3. Cost also moves with fence type, materials, length, gates and site conditions, which is why a range from a guide never replaces a measured quote.
What should a Leander fence quote spell out before you sign?
A quote should name the material grade, the footage and the price per linear foot in writing. Ours names the picket grade, #1, #2 or #3, on the quote, and it sets price by the footage measured on site and the grade chosen.
A quote that leaves the grade out lets the crew pick it for you. Our written quote also carries our warranty, which is one year on craftsmanship. That is the only warranty we write, and it covers craftsmanship rather than materials. Read any warranty a rival hands you for the same split.
Then read the fine print for the thing that goes wrong after the check clears. In a two-star Google review of Texas Fence from May 19, 2026, a reviewer described a gate problem: “our gates have continued to fall apart. Even the ones we don’t use. They have come to repair them twice already and need to come a third and we’ve only had the fence for a couple of months. They haven’t given us an answer as to why this is happening.”
Gates, grade and warranty belong on the page before you sign, rather than in a promise made on the porch.
How do you check a Leander fence company’s reviews, insurance and crews?
Start with a fact that surprises people: Texas has no statewide general-contractor, home-improvement or fence-contractor license. The state’s licensing authority regulates only specific trades such as electricians and air-conditioning and refrigeration contractors, so a residential fence builder can work statewide without a state license, and any licensing sits at the county or city level (Texas Department of Licensing and Regulation, 2026).
That leaves the checking to you. Read recent reviews, not the top ones. Ask for proof of insurance in writing. Look at the company’s standing with the Better Business Bureau. We hold an A+ BBB rating, with accreditation held since March 2003.
Standing matters most when a deposit is at stake. A one-star Google review of Southland Fence & Supply from September 25, 2026, reads: “They stole my money. Paid them a deposit and I never heard back from them. They asked that I pay with a check and not a credit card. Now I see why. Do not do business with them. I just saw that they lost their BBB accreditation.”
Then ask how many crews the company fields, because crews decide who shows up on the day you were given.
What should you do at the estimate and after the install?
Before anyone digs, ask who notifies Texas811. Texas law says a person who intends to excavate must notify a notification center not earlier than the 14th day before the dig and not later than the 48th hour before it, excluding Saturdays, Sundays and legal holidays (Texas Utilities Code Chapter 251).
Texas811 is the statewide notification service. Under the same chapter, the center must notify each member operator that may have an underground facility near the dig within two hours of receiving the notice. Post holes go into the ground you own, so confirm the notice is filed before the auger arrives.
At the estimate, hold the company to the earlier sections: footage measured, grade named, gates priced, warranty written. After the install, walk the fence line with the crew lead and point at anything you dislike before you pay. Photograph the posts and gates the same day, so any later conversation starts from what you saw.





